Soft strip out works on Level 1 of an occupied building, to prepare the floor for refurbishment for a new tenant.
Client
Interaction
Programme
1 Week
Size & Value
5,000 Sq ft – £10,000.00
Waste Removed
16.5 Tonnes with 100% recycled
Key Works Completed
Removal of:
Specific Challenges
Working in between 2 occupied floors we ensured noise was kept to a minimum to ensure we didnt affect their daily operations.
Debris Removal via the Stairs.
Wait & Load Waste Removal
”“Ive known Lawmens for a long time and it doesnt matter how big or small the project is, they always pay the same attention to detail, and deliver every time"