Project Profile

Soft strip out works on Level 1 of an occupied building, to prepare the floor for refurbishment for a new tenant.

Client

Interaction

Programme

1 Week

Size & Value

5,000 Sq ft – £10,000.00

Waste Removed

16.5 Tonnes with 100% recycled

Key Works Completed

Removal of:

All floor and ceiling finishes

Plasterboard Partitions

Glazed Partitions

Blockwork Walls

Perimeter Heating

Lift Lobby & Staircase

M & E from Ceiling Void

WC Areas

Fixtures & Fittings

Specific Challenges

Working in between 2 occupied floors we ensured noise was kept to a minimum to ensure we didnt affect their daily operations.

Debris Removal via the Stairs.

Wait & Load Waste Removal

“Ive known Lawmens for a long time and it doesnt matter how big or small the project is, they always pay the same attention to detail, and deliver every time"

Matt Prouse